Our work in photos

In short

Real photos of work by the Easy Smart Est. (السهل الذكي) team, taken before anything was closed. On our projects we photograph every stage and hand it over with a handover report, and its photos are kept for you.

Stages
Stage 1

Before the pour

We fix the drain sleeves and outlets in place before the pour, so the concrete is never broken later to pass a pipe.

A row of white drain sleeves with capped ends tied inside a ground-beam steel cage before the concrete pour in Dhahran
Drain sleeves tied inside the ground-beam steel before the pourDhahran

What you see: Sleeves with capped ends, tied in place inside the steel cage before the concrete is poured.

Technician in the navy Easy Smart Est. uniform, seen from behind, tying a drain sleeve to ground-beam steel before the pour in Dhahran
An Easy Smart Est. technician fixing a sleeve to the beam steelDhahran

What you see: A technician in the Easy Smart Est. uniform tying a sleeve to the steel by hand before the pour.

White drain outlet pipes standing over reinforcement and polyethylene sheeting before the floor slab pour in Dhahran
Drain outlets standing in place before the floor slab is pouredDhahran

What you see: Drain outlets rising from the floor with their caps, over the steel and sheeting, before the pour.

Stage 2

Underground drainage before backfilling

Drain lines are laid underground with their ends capped, and photographed before they are backfilled.

Underground drainage network before backfilling, with risers, floor drains and joints bedded in mortar
An underground drainage network before backfilling

What you see: Risers, floor drains and joints bedded in mortar, before backfilling.

White drain line in a trench along the side passage of a building, with capped outlets before backfilling
An external drain line along the side passage before backfilling

What you see: The drain line laid in the trench beside the building, with capped outlets, before backfilling.

Stage 3

Inside the wall and under the slab before covering

Every pipe is fixed and photographed before the wall or ceiling is closed.

White drain riser with a Y fitting held by a metal bracket on an open wall before covering
A drain riser with a Y fitting and a metal bracket before the wall is coveredEastern Province

What you see: A drain riser fixed with a metal bracket on an open wall, before it is covered.

White drain risers and a green water pipe fixed with clamps on a wall before covering in Khobar
Drain risers and a water pipe fixed with clamps before coveringKhobar

What you see: Drain risers and a water pipe fixed to the wall with clamps, still open before closing.

Blue concealed cistern frame fixed on a block wall with green water lines before covering
A concealed cistern frame and water lines fixed before coveringEastern Province

What you see: The concealed cistern frame fixed to the wall, with water lines run around it before covering.

Water manifold in its box with green supply lines run along a block wall and the floor before plastering
A water manifold and supply lines on the wall and floor before covering

What you see: The water manifold in its box, with supply lines run straight along the block wall and the floor, before plastering.

Bathroom before finishing with supply lines on the wall and floor, a floor drain and a blue wall-hung toilet frame
A bathroom before finishing: supply lines, a floor drain and a wall-hung toilet frame

What you see: Supply lines neatly run on the wall and floor, a floor drain and a wall-hung toilet frame, before finishing.

White drainage pipes hung under a concrete slab on metal hangers, joining into one main line
Drainage pipes hung under the slab on hangers

What you see: Drainage pipes fixed under the slab with metal hangers, joining into one main line.