Real photos of work by the Easy Smart Est. (السهل الذكي) team, taken before anything was closed. On our projects we photograph every stage and hand it over with a handover report, and its photos are kept for you.
Before the pour
We fix the drain sleeves and outlets in place before the pour, so the concrete is never broken later to pass a pipe.

What you see: Sleeves with capped ends, tied in place inside the steel cage before the concrete is poured.

What you see: A technician in the Easy Smart Est. uniform tying a sleeve to the steel by hand before the pour.

What you see: Drain outlets rising from the floor with their caps, over the steel and sheeting, before the pour.
Underground drainage before backfilling
Drain lines are laid underground with their ends capped, and photographed before they are backfilled.

What you see: Risers, floor drains and joints bedded in mortar, before backfilling.

What you see: The drain line laid in the trench beside the building, with capped outlets, before backfilling.
Inside the wall and under the slab before covering
Every pipe is fixed and photographed before the wall or ceiling is closed.

What you see: A drain riser fixed with a metal bracket on an open wall, before it is covered.

What you see: Drain risers and a water pipe fixed to the wall with clamps, still open before closing.

What you see: The concealed cistern frame fixed to the wall, with water lines run around it before covering.

What you see: The water manifold in its box, with supply lines run straight along the block wall and the floor, before plastering.

What you see: Supply lines neatly run on the wall and floor, a floor drain and a wall-hung toilet frame, before finishing.

What you see: Drainage pipes fixed under the slab with metal hangers, joining into one main line.
Building a villa or a building in the Eastern Province?
Send us the drawings or photos of the site, and we send you a written quotation.