Home / Field team
The field team
Every stage has a photo report, recorded in the Easy Smart Platform.
ExecutionDocumentation

01
From the site to the client's screen
Three stops from the site to your screen.
Field team
Project management
Easy Smart Platform
02
How we work on site
Five steps on every site.
1
Before startingReview the drawing and the stage plan from the platform.
2
During workPhotograph the item from two angles before it is covered.
3
InspectionInspect the rough-in before the pour or plaster and note it.
4
Item doneFill in the report form and upload the photos from the phone to the platform.
5
ReviewThe report is reviewed and tied to the stage so the client can see it.

Current stage reportPhotos before covering, from two angles
Reviewed before it is shown
Visible to the client in the platform
Illustration03
Photography rules
Fixed standards for every site.
Safety before photosHelmet, boots and fall protection for all work at height.
Detail shotsTools, materials and rough-in, with no faces or signboards.
Two angles per itemTwo shots from a fixed spot so the client can compare before and after.
A clean siteWe clear the surface before taking the photo.
Follow your site yourself
Everything the team uploads reaches you in the platform: photos, reports and records.