Quality and safety: we inspect and record before the work is covered

What we commit to on site, and what stays on file.

01

Inspection before covering

The rule: nothing is covered before it is inspected and recorded.

Pressure test before pipes are closedWe pressure-test the water network before plastering or tiling, so any leak shows while it is easy to fix.
Rough-in check before the pourSleeves and risers are in place before the concrete, and photographed.
Electrical rough-in before plasterConduits and boxes are run and checked before the walls are covered.
Gypsum sequenced with the systemsDetector, sprinkler and light positions are fixed before the ceiling is closed.
02

Our standards on site

Fixed for every site; they do not change with the crew.

Safety firstHelmet, boots and fall protection for any work at height.
A clean siteWe clear the surface before we photograph a stage.
No faces, no signboardsReports are photographed on the details: tools, materials and rough-in.
Two angles per itemTwo shots from a fixed spot, so the client can compare before and after.
03

Records that stay

What reaches you and what stays in the project file.

Stage reportWith work and photos, for every site when each stage is completed.
Stage handover recordWritten before the next stage begins.
Workmanship warrantyA written clause in the contract, with its period stated.
04

Warranty and maintenance

The warranty is written, and maintenance is requested in the platform with a photo of the fault.

Warranty written into the contractWorkmanship warranty is a written clause, with its period stated.
Maintenance by photo requestUpload a photo of the fault in the platform and the request reaches the team.
Periodic fire-system servicePressure, pump and detector checks at regular intervals.

See the documents before you start

We walk you through each document you receive at every stage.