We handle plumbing for villas and buildings from the start: before and after the concrete pour, right through to fitting the sanitary fixtures. Each stage is handed over with a signed handover report, so everything is clear.

What we do

Our plumbing service, from start to handover

Rough-in before the concrete pour

Setting pipe sleeves (the openings pipes pass through in the concrete) and risers (the vertical pipes) in the right places.

Water supply and drainage lines

Hot and cold water pipes and the drainage network inside the building.

Manholes, tanks and pumps

As per the agreed contract scope.

Sanitary fixture installation

Washbasins, toilets, mixers and water heaters.

A technician in uniform kneeling and welding a green water fitting on a block wall with laid pipes
Rough-in, finishing and maintenance

Plumbing in three stages, for supply and drainage

  • Rough-in: pipes laid before the concrete pour and inside the walls before plastering, and pressure-tested before they're closed up.
  • Finishing: installing and commissioning sanitary fixtures, mixers and water heaters.
  • Maintenance: finding and fixing blockages with as little breaking as possible.

You can hire us for one stage or all three. And because we also do plastering and gypsum, we coordinate when the walls and ceilings get closed, so nothing has to be broken later.

Have these ready before you contact us

  • The plumbing drawing or the architectural drawing
  • The stage the building has reached
  • For maintenance: photos of the problem area, and the result of the meter test below
A technician in uniform seen from behind tightening a pipe fitting with a wrenchA side passage of a building under construction with white drain and vent risers over sandA white drain line laid in sand with branches at its end, before backfilling
Common questions

Questions our clients ask

What are pipe sleeves and risers?

Pipe sleeves are openings set before the concrete pour so pipes can pass through them later. Risers are the vertical pipes that run between floors.

Do you formally hand over each stage?

Yes, with a handover report signed by the supervising engineer before moving on to the next stage.

Is the work under warranty?

Yes. The workmanship warranty is written into the contract.

Read more:

Get a quote

Request a quote in a few taps

Pick from the options and we'll prepare a written WhatsApp message for you. Send it with one tap and we'll get back to you.

  1. Choose the service
  2. We prepare your message
  3. You send it and we reply

Service (choose one or more)
Stage

Your message

You can send plans or photos on WhatsApp once the chat opens.

Where we work

We serve the Eastern Province

DammamKhobarDhahranQatif
Our other services

All your building work from one company